The Quick Answer
- Expect two to five days on site for a typical driveway or patio, longer for multi-feature outdoor living projects.
- 80% of a paver surface's lifespan is decided below the surface — base depth and compaction, not the pavers themselves.
- A written scope should name base depth, compaction method, edge restraint, and joint sand — if it doesn't, ask why.
- You can stay in the house the whole time; most projects never touch water or power.
01
When should you start planning?
Four to eight weeks before you want crews on site. Design and material selection take a week or two, HOA approvals (common across Central Florida communities) can take another two to four, and material lead times vary by season. Starting in advance also means you're choosing pavers from the full catalog rather than whatever is in stock.
02
What should you have ready before an estimate?
Rough dimensions or photos of the area, any HOA architectural guidelines, and a sense of how you'll use the space — parking a third car, entertaining, a future pool. An estimator who sees the end use can size the base correctly the first time: a driveway that will carry a work truck is built differently than a walkway.
How It Works
1. Design, layout, and approvals
The project starts on paper: field measurements, a layout that handles drainage away from the house, and material selections. If your community has an HOA, this is when the submittal package goes in. Nothing is excavated until the plan and approvals are settled.
2. Excavation and base construction
The existing surface is removed and the area is dug to depth — typically 7 to 12 inches below finished grade depending on use. Crushed limerock base goes in lifts, each lift compacted with a plate compactor or roller. This is the stage that separates a 25-year surface from one that ruts in two summers.
3. Laying, cutting, and locking it in
A screeded inch of bedding sand sits on the compacted base, pavers are laid in the agreed pattern, field cuts are made at borders and curves, then concrete or spiked edge restraints lock the perimeter. Polymeric or silica sand is swept into the joints and the whole field is compacted again, seating every paver into the bedding layer.
Where It Goes Wrong
What goes wrong when the process is rushed?
Skipped compaction lifts show up as ruts under wheel paths within a year or two. Missing edge restraints let the field spread — you'll see joints widening at the borders first. And laying over an old failing slab instead of excavating transfers every crack in that slab up through the new surface. All three are invisible on day one and expensive at year three.
The estimate red flags
A price dramatically below the others usually removes the invisible line items: base depth, compaction passes, edge restraint, or proper joint sand. Ask every bidder the same three questions — how deep is the base, how is it compacted, what restrains the edges — and compare the answers, not the bottom lines.